Mobile Welding Rig Rate & Job Estimator
Before you roll the truck, find out if the job covers the rig, the drive and your time. Then copy an itemized estimate you can send to the customer.
Get the 6-in-1 Contractor Pricing App on EtsyThe estimator needs JavaScript. In WordPress, open the front-end page preview to run it.
Edit rig costs, margin and multipliers
Your quote and margin
- Quote before tax
- Estimated job cost
- Amount left after modeled costs
- Estimated job margin
- Price at target margin
- Break-even on-site rig rate
See the price breakdown
- On-site labor
- Flat trip fee
- Minimum charge adjustment
- Mileage charge
- Materials selling price
- Thermal handling charge
- Emergency premium
Price the whole job before you say yes
Use the 6-in-1 offline app to check labor, overhead, markup and profit when the next quote has more moving parts.
What does it cost to put your rig on a job?
Start with the bills you pay even when the truck stays parked. Say those bills run $1,600 a month. At 80 billable hours on site, each hour needs to recover $20. At 50 hours, it needs to recover $32. Add $55 for crew time and $15 to run the rig on site, and your hourly cost rises from $90 to $102 before travel and job materials. Include an allowance for your own time if you work alone.
The calculator adds drive labor and vehicle cost separately. With a half-hour round trip and 20 miles at 75 cents a mile, the drive costs $42.50. If the flat trip fee and mileage you charge bring in $105, enter that policy under travel. The $105 goes on the quote. The $42.50 goes on the cost side. Keep fixed truck costs in your monthly overhead and count variable mileage costs once.
How to price a one-hour gate repair
Say you quote $125 for an hour of steel gate work, charge $65 to bring the rig out, and have a $200 labor and trip minimum. Labor plus the trip fee comes to $190, so the calculator adds $10 to meet your minimum. Add $25 for parts and supplies and the customer estimate comes to $225 before tax. With the example drive and rig costs, the job costs $157.50 and leaves $67.50, a 30% margin.
If your minimum includes everything, check your written policy before using this model. This tool applies the minimum to labor plus the flat trip fee, then adds mileage, materials and specialty handling. The example emergency setting adds 50% to that subtotal. Show the amount you actually plan to collect and the terms you agreed on before dispatching the rig.
What published mobile welding prices include
| Shop | Published pricing | What to compare |
|---|---|---|
| Iron Trail Welding, Gatesville, TX | $100/hr mobile rate, $150 minimum | The page includes the truck, standard tools and basic consumables in the rate. Extended travel has its own policy. |
| KC Ironcore, Kansas City | $225 for the first hour including metro travel, $125/hr after. Listed gate and fence repairs run $175 to $400. | An included trip changes the comparison. Look at the total for the same visit. |
These are individual businesses’ published examples. The estimator’s $125 rig rate, $65 trip fee, $200 minimum and $2 per round trip mile are editable starting assumptions or a mileage option. Use your own local pricing and costs.
Price specialty material work from the confirmed scope
The sample aluminum factor is 1.5× on labor. Cast iron starts at 1.2× with an editable $300 thermal handling charge. Those figures are quote settings. Use the actual extra rig time and direct costs for the job. The handling charge is what the customer pays, while added time and costs reduce what you keep. Enter that time once so it stays out of the regular on-site hours if it’s already in the handling field.
For a cracked trailer frame or other load-bearing work, get the scope confirmed by a qualified professional before treating any calculator total as a repair quote. The job type gives your estimate a label. It carries no default repair price or repair approval.
Text back the lead while you’re on a job
When you can’t pick up, a reply can ask what needs welding and where the rig needs to go. HighLevel’s missed call text back can send that first response once you set it up.
Affiliate disclosure. I may earn a commission through this HighLevel link at no extra cost to you.
Mobile Welding Rig Pricing FAQs
What’s the difference between my rig rate and my break even rate?
Your rig rate is what you charge for an hour on site. Your break even rate is what that hour costs before you add travel, materials or profit. The calculator gets the break even rate by dividing monthly overhead by billable hours, then adding crew labor and the hourly cost of running the rig. In the example, $1,600 divided by 80 hours adds $20 to each hour. Add $55 for labor and $15 for running costs and that hour costs you $90.
If you charge $125, there’s $35 between the selling rate and the on-site cost. The trip can eat into that cushion fast. Check the whole job’s margin after the drive and materials are included. If you weld alone, put a cost on your own time under loaded crew labor so the calculator can show what the business keeps after allowing for your work.
How does a slow month change what I should charge for mobile welding?
Fewer billable hours raise the cost of each hour on site. With $1,600 in fixed monthly overhead, 80 billable hours put $20 of overhead on each hour. At 50 hours, the same bills put $32 on each hour. That adds $24 to a two-hour job. To keep a 20% margin, that job needs $30 more in selling price, assuming the other costs stay the same.
Open Edit rig costs, margin and multipliers and try your usual month and a slow one. Look at Price at target margin each time. Use on-site hours you expect jobs to cover. The model spreads fixed overhead over those hours and counts paid drive time separately. If your slower months keep pulling the quote under your target, look at your rate, your minimum and how much driving you book into a day.
How much farther can I drive before a flat welding trip fee eats my margin?
Start with the gap between your estimated cost and the most you can spend at your target margin. On a $225 gate quote with a 20% margin goal, your costs can reach $180. The calculator’s starting job costs $157.50, leaving $22.50 of room before you fall below that goal.
Now try a site that adds 10 round trip miles and 24 minutes (0.4 hours) of paid drive time. At 75 cents a mile and $55 an hour for crew time, that adds $29.50. Your costs rise to $187, so the same $225 quote falls short of the goal. You’d need $233.75 to earn 20% on the same job. Enter both miles and drive time even if you charge one flat fee. Turn on the $2 mileage option only if you actually bill mileage on top of that fee.
Why didn’t raising my hourly rate change the price of a small welding job?
The minimum can absorb an hourly rate increase until labor and the flat trip fee add up to more than the minimum. Take the example with one hour of steel gate work, a $65 trip fee, a $200 minimum and $25 of materials. At $125 an hour, labor and the trip add up to $190. The tool adds $10 to meet the minimum, then adds materials. The quote is $225.
Raise the rate to $135 and labor plus the trip reaches $200 on its own. The $10 adjustment disappears and the quote stays $225. At $145 an hour, the same visit comes to $235. If short calls keep coming in below your target margin, check the minimum first. The tool applies it to labor and the flat trip fee. Mileage and materials are added after that check.
How do I price on-site aluminum work if labor and supplies both cost more?
Enter your expected on-site hours, choose Aluminum, then enter the actual cost of the filler, gas and other supplies for that job. Aluminum starts with a 1.5× labor setting. At a $125 rig rate, one on-site hour is $187.50 in labor. If you enter $40 in supplies and a 25% materials markup, the materials line is $50. The labor multiplier and the materials markup affect separate lines.
Change the labor multiplier under Edit rig costs, margin and multipliers to match what you charge. Give longer jobs the actual time they need. If your extra prep is already in the hours, decide what the premium is meant to cover before adding it on top. Count gas or consumables under job materials or in your hourly running cost based on how you track them. Counting the same supplies in both fields makes the job look less profitable than it is.
How do I tell whether a cast iron handling fee covers the extra rig time?
Compare the handling charge you intend to collect with the cost of the added time the job ties up your rig. The calculator starts with 1.2× on-site labor and a $300 handling charge. Both are editable quote examples. If your rig costs $90 per hour and the confirmed scope adds two hours, that time costs $180. Those two hours add $225 to the price you need at a 20% margin, before any other costs tied to that handling.
Put the two hours in Extra rig time and the charge in Thermal handling charge. The first raises your cost. The second raises the customer quote. Include only time you haven’t already counted in the main on-site hours. Then check the margin for the whole job. If the scope is unclear, get it confirmed before you rely on the estimate.
Does the emergency multiplier apply to mileage and materials too?
Yes. The estimator applies the emergency multiplier to the whole subtotal. That includes labor, the flat trip fee, any minimum adjustment, mileage, materials and any cast iron handling charge. A $225 standard quote becomes $337.50 at 1.5×. The customer summary shows the $112.50 difference on a separate emergency premium line.
Check how your shop prices evenings or weekends before you use that total. If your policy raises only labor, you can leave the emergency switch off and enter the higher hourly selling rate directly when it fits the input range. Review the minimum adjustment too, since a higher hourly rate can reduce it. If you’ll pay overtime or incur other added costs, update the loaded crew rate or enter the extra amount where it belongs. The emergency switch changes what you charge. Your cost inputs determine how much you keep.
Why does my customer quote show a different number from the price at target margin?
The customer quote shows what your current rates and charges add up to. The price at target margin shows what the job would need to bring in to meet the margin you entered. If a job costs $225 and you want a 20% margin, divide $225 by 0.80. That gives you $281.25. Adding 20% to the cost would give you $270 and leave a margin of about 16.67%.
If the quote is below your target, check labor hours, paid travel time, material costs and the minimum. Then adjust the rate or charges you actually plan to quote. The estimate you copy lists the customer charges and the total before applicable tax. Your rig cost, margin and target price stay in the results. Review the scope and travel terms before you send it so the customer can see what the estimate covers.